Used 2018 Heartland ElkRidge Xtreme Light 293 Fifth Wheel
Heartland ElkRidge Xtreme Light fifth wheel 293 highlights:
- Kitchen Island
- Free-Standing Table
- Dual Recliners
- Private Bedroom
- Residential Refrigerator
With this ElkRidge Xtreme Light fifth wheel, you will finally have the RV you've been dreaming of! Whether you enjoy spending your time in the kitchen working on dinner at the large island with a double sink as you prepare it to be fried up on the 3-burner range top or cooked in the residential microwave oven, or you enjoy spending your time watching dinner being prepared from the comfort of the dual recliners, the sleeper sofa, or the free-standing table with chairs, in this fifth wheel you will be able to do it all.
The ElkRidge Xtreme Light fifth wheels offer you the industry's first, low cost fifth wheels. Designed for lighter duty trucks, the Xtreme Light provides many luxuries of recreational living without compromising its storage and ease of towing. The fully lined large pass-through storage is one example of the Xtreme Light's ability to impress by storing all of your large luggage, outdoor camping equipment, or set of golf clubs. From the laminated sidewalls and heated and enclosed underbelly, to the painted front cap with Tight Turn Technology and Universal Docking Station, you will enjoy the ElkRidge Xtreme Light for many years to come. You will love spending your days in the well-designed living areas with vaulted ceilings and roomy bathrooms, and the fully functional kitchen will leave you amazed at its extreme usefulness.
Great experience, had helpful and very informative members of their team who took the time to walk me around and make sure I found the correct camper for me. JW made the process feel easy and took a ton of stress out of the purchasing process. Will be going back for any future purchases. - Lawerence
You Save: $15,000
Sale Price: $23,929
Stock# 101002A
Sleeps | 4 |
Slides | 2 |
Length | 31 ft 7 in |
Ext Width | 8 ft |
Ext Height | 11 ft 10 in |
Hitch Weight | 1640 lbs |
GVWR | 11600 lbs |
Dry Weight | 8954 lbs |
Fresh Water Capacity | 47 gals |
Grey Water Capacity | 40 gals |
Black Water Capacity | 40 gals |
Tire Size | 16 |
Furnace BTU | 35000 btu |
Available Beds | Queen |
Refrigerator Type | Residential Stainless Steel |
Refrigerator Size | 13 cu ft |
Cooktop Burners | 3 |
Number of Awnings | 1 |
Axle Weight | 5100 lbs |
LP Tank Capacity | 30 |
Water Heater Capacity | 12 gal |
AC BTU | 13500 btu |
Awning Info | Electric with LED Lights |
Axle Count | 2 |
Washer/Dryer Available | Yes |
Number of LP Tanks | 2 |
Shower Type | Standard |
Electrical Service | 38 amp |
VIN | 5SFRG3322JE383717 |
Loading