Used 2018 Newmar Bay Star 3532 Motor Home Class A

Previous
Next
Floorplan Title
2018 3532 Features and Options

Newmar Bay Star class A motor home 3532 highlights:

  • Triple Slide Outs
  • Walk-Through Bathroom
  • 74" Jack Knife Sofa
  • Overhead Storage

 

You will want your next road trip to extend just a little bit longer with this triple slide out 3532 Bay Star class A motor home. With plenty of comforts throughout this model it will not seem like you are camping, but rather enjoying your second home! You can easily bring along all of your necessary camping items and store them in the overhead cabinets. Enjoy visiting with family and friends at the 74" jack-knife sofa, and fixing your favorite meals is a breeze in this fully-equipped kitchen. The walk-through bathroom has a private toilet/shower area and across the hall you will find his/her sinks!

 

Get ready for any road trip with a Newmar Bay Star class A motor home! Along the exterior there is a Masterpiece full painted graphics with clearcoat finish plus a DuraShield protection on the front cap which is sure to turn heads as soon as you enter the campground! Inside each model you will find Calypso glazed Maple cabinet doors, solid surface counter tops in the bathroom and bedroom, plus Flexsteel deluxe leather sofa and front seats. Your trips are made easier with the 8 cu. ft. Norcold refrigerator and the 30" over-the-range microwave. You won't be lacking for entertainment with the Sony LED TV and DVD player in the living and bedroom area plus there is a dash radio/CD player. For luxury and convenience you will want a Bay Star class A motor home by Newmar! Come select your model today!

What Our Customers Are Saying

Great Service!

Our propane stopped working while on a trip from Kansas City to Alaska. I stopped at Eastside and they were very helpful. A Tech even took time to help me make sure I did need a new regulator. We were able to make the repair and get back on the road. - Mark
Sale Price: $99,888
Optimum RV
Location: SC, Spartanburg
Stock# 5AR291


2018 3532 Specifications
Sleeps 6
Slides 3
Length 35 ft 11 in
Ext Width 8 ft 6 in
Ext Height 12 ft 8 in
Int Height 6 ft 8 in
Hitch Weight 5000 lbs
GVWR 24000 lbs
Dry Weight 19322 lbs
Cargo Capacity 4668 lbs
Fresh Water Capacity 75 gals
Grey Water Capacity 60 gals
Black Water Capacity 40 gals
Furnace BTU 40000 btu
Fuel Type Gas
Miles 50659
Engine Triton V10
Chassis Ford F-53
Horsepower 320 hp
Fuel Capacity 80 gals
Wheelbase 228 in
Available Beds Queen
Torque 457 ft-lb
Refrigerator Size 8 cu ft
Convection Cooking Yes
Cooktop Burners 3
Shower Size 40" x 26"
Number of Awnings 1
Axle Weight Front 9000 lbs
Axle Weight Rear 15500 lbs
LP Tank Capacity 25
Water Heater Capacity 6 gal
AC BTU 13500 btu
TV Info LR LED TV, BR TV
Awning Info Power
Gross Combined Weight 30000 lbs
Shower Type Standard
Electrical Service 30 amp
VIN 1F66F5DY2J0A05291
For more information Contact Us
Similar RVs and Floorplans

Loading

www.usedrvsforsale.com is not responsible for any misprints, typos, or errors found in our website pages. Any price listed excludes sales tax, registration tags, and delivery fees. Manufacturer-provided pictures, specifications and features may be used as needed. Inventory shown may be only a partial listing of the entire inventory. Please contact us at 800-515-9672 for availability as our inventory changes rapidly. All calculated payments are an estimate only and do not constitute a commitment that financing or a specific interest rate or term is available.

Manufacturer and/or stock photographs may be used and may not be representative of the particular unit being viewed. Where an image has a stock image indicator, please confirm specific unit details with your dealer representative.

UsedRVsForSale.com is not responsible for any misprints, typos, or errors found in our website pages. Any price listed is the responsibility of the seller. Contact the seller to confirm any prices as they can change without notice.